77.25.XX Bodin Sixth form college ventilation such as building wing K
Sweco Norge AS (Hovedenhet) · Bodø
| Buyer | Sweco Norge AS (Hovedenhet) |
|---|---|
| Location | Bodø Statistics for Bodø |
| County | Nordland - Nordlánnda |
| Sector | Ventilation installation work (CPV 45331210) |
| Published | |
| Deadline for submissions |
Description
Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates…
View the notice at TED, Office des publications de l'Union européenne ↗
Source: TED (ted.europa.eu), © European Union, Free reuse (Commission Decision 2011/833/EU) · Data modified.
Local context
| Location | Open tenders | Per 1,000 residents |
|---|---|---|
| Bodø | 9 | 0.2 |
| Nordland - Nordlánnda | 11 |