Energy

Where Norway's hydropower is made, and who benefits

Hydropower stations stand in a limited set of valleys, fjords and mountain districts, far from where most people live. This analysis compares average annual output, installed capacity and output per resident across Norwegian municipalities, and follows the money from the power stations to property tax revenue.

A few valleys and fjords produce the power

The typical municipality has 3 hydropower plants hydropower stations and an average annual output of 36.1 GWh GWh, but the totals are concentrated. Suldal produces 7,103 GWh GWh in an average year, Sirdal produces 5,267 GWh GWh and Tinn produces 4,235 GWh GWh.

Summed by county, the output is 34,518 GWh GWh in Vestland, 17,508 GWh GWh in Nordland - Nordlánnda, 14,893 GWh GWh in Agder, 13,517 GWh GWh in Telemark and 12,211 GWh GWh in Rogaland. The big cities hardly figure on the map: Oslo - Oslove has 18.7 GWh GWh and Stavanger has 0.5 GWh GWh.

Station counts and output do not move together. Sunnfjord has 63 hydropower plants stations and 1,100 GWh GWh, while Indre Østfold, in Østfold, has 5 hydropower plants stations and 3,851 GWh GWh. A single large station on a big river can matter more than a long row of small ones in the hills.

A city can be a producer too. Sandnes has 13 hydropower plants stations and 2,369 GWh GWh, and Trondheim - Tråante has 1,038 GWh GWh.

Average annual hydropower generation (1991–2020): top 10 municipalities

Median across the 357 municipalities: 36.1 GWh

Capacity is not the same as output

Installed capacity tells how much power a station can deliver at its peak, while output tells how much it delivers across a year. The leading capacities are 2,463 MW MW in Suldal, 1,320 MW MW in Aurland and 1,260 MW MW in Sirdal, against a median of 8.3 MW MW.

The capacity table and the output table do not line up. Aurland has 1,320 MW MW installed and an average output of 2,831 GWh GWh, while Tinn reaches 4,235 GWh GWh from only 704.4 MW MW. Differences like this can reflect the design of the stations: some are built to deliver power in short peaks, others run for most of the year.

Sandnes deserves a mention again. Its stations add up to 887.5 MW MW, a reminder that a municipality covers a large area and its stations need not stand near the town itself.

Installed capacity in hydropower plants: top 10 municipalities

Median across the 357 municipalities: 8.3 MW

Output per resident

Divide the output by the population and a different set of places comes to the front. Eidfjord produces 3,016 MWh per inh. MWh per inhabitant in an average year, Sirdal produces 2,756 MWh per inh. MWh and Suldal produces 1,825 MWh per inh. MWh, against a median of 6.0 MWh per inh. MWh per inhabitant.

These figures mainly describe a small population next to large stations. Tinn and Hemnes produce 767.9 MWh per inh. and 732.2 MWh per inh. MWh per inhabitant, and a town like Rana - Raane produces 119.3 MWh per inh. MWh per inhabitant. A big city such as Bergen produces 0.1 MWh per inh. MWh per inhabitant, even though it has 5 hydropower plants stations.

The ratio says where the stations are in relation to the people who live around them, not how much of the power is used locally. Electricity travels over the grid, and the table does not show where it ends up.

Average annual hydropower generation per inhabitant: 10 municipalities side by side

Median across the 351 municipalities: 6.0 MWh per inh.

From water to property tax

For some small municipalities, the stations are the tax base. Of the property tax revenue in Eidfjord, 95.9% comes from hydropower, wind power and petroleum plants, and in Sirdal the share is 68.1%. In the median municipality the revenue is 4,200 NOK per inh.; it reaches 70,752 NOK per inh. in Aukra, 61,697 NOK per inh. in Sirdal and 58,284 NOK per inh. in Eidfjord, which dwarfs it.

The link between output and money does not follow a rule. Rana - Raane produces 3,084 GWh GWh. Its property tax revenue is 4,570 NOK per inh., and only 29.0% of that comes from power plants. Sandnes has a power share of 85.5%, but its revenue is 876 NOK per inh., a small sum in a municipality with a large population.

The power plants behind the indicator are not always hydropower. Aukra has a hydropower output of 0.0 GWh GWh and still collects 99.4% of its property tax from power and petroleum plants. Revenue also depends on the tax rates a municipality sets and on the value assigned to the plants, which these figures do not show.

Property tax revenue per inhabitant: top 10 municipalities

Median across the 350 municipalities: 4,200 NOK per inh.

Wind, rain and the limits of the picture

Wind power is a smaller story. The median municipality has 0 wind power plants wind farms, and Åfjord has 6 wind power plants and Bjerkreim has 4 wind power plants. Hå and Gjesdal, in Rogaland, have 3 wind power plants and 3 wind power plants. A wind farm that touches several municipalities is counted in each of them.

Rain does not decide the result either. Samnanger receives 3,610 mm a year and produces 491.5 GWh GWh, while Indre Østfold receives 1,013 mm and produces 3,851 GWh GWh. The water that drives a station falls in a catchment area that can lie far from the municipality where the station stands, so the municipal rainfall figure and the municipal output figure describe different places.

Output is a long-term average, not a year's production, and it belongs to the municipality where the station stands. That makes the table a map of power stations rather than of water, wind or customers.

Key takeaways

Go further